Permits
-
All Building Permit Applications
View and print Permit Applications.
-
Commercial Building Permit
Apply for a commercial building permit.
-
Demolition Permit
All demolitions are required to be permitted.
-
Event Tent Permit
Event tents over 400/sf are required to be permitted.
-
Gas Permit
Fuel gas permit systems are permitted separately from building permits.
-
Logging
Obtain a Logging Permit.
-
Online Permits
Access the Permit Portal to complete the following tasks: Request an Inspection Dock/Seawall Permit Applications Electrical Permit Application HVAC Permit Application Manufactured Home Permit Application Single Family Residential Permit Application
-
Erosion Control Permit Requirements
Learn how to apply for an Erosion Control Permit.
-
Building Plan Resources for Design Professionals
Building Plan detail that must be included on building plans as applicable.
-
Plumbing Permit
Apply for a plumbing permit.
-
Right-of-Way / Event Permit
See information on the County Code of Ordinances regarding the use of public rights-of-way.
-
Requirements for Obtaining Building Permits
Before a building permit can be issued, several documents must be presented to the building, planning, and zoning office.
-
Septic Tank Permits
Learn how to apply for a Septic Tank Permit
-
Sign Permit
Upon receipt of a properly completed application, the Building and Zoning staff will examine and process the application within 10 working days.
- I want to move a manufactured/mobile home into Greene County, what is my first step?
- What are the setbacks in Greene County?
- I want to work as a Builder or Trade Professional in the construction industry in Greene County. Do I need a State License?
- Can I have an Inspector come out at a specified time?
- If the power has been disconnected from my property, does the property have to be inspected before the power company will reconnect it?
- If I have a complaint about a permit, inspection or zoning problem, who do I contact?
- Does Greene County require an Occupational Tax Certificate from contractors and subcontractors to obtain a permit?
- Does Greene County perform temporary power pole inspections?