SPLOST VI Road Projects
The final collections under SPLOST VI were made in December 2020 and remitted to the County in January. Having received the final amounts for that SPLOST Program, the Commissioners’ vote wraps up the six-year program and expends the funds in accordance with the allocations approved in the Referendum by the citizens. The Commissioners work diligently to ensure that SPLOST dollars are spent efficiently and in accordance with the projects approved by the voters. SPLOST VI has been instrumental in providing funding for road work over the last six years.
Approved SPLOST Road Projects for 2020
Cross Drain Replacements (where needed)
The cross-drain replacements will involve some significant work with detours and lane closures.
Armour Bridge Road | Eley Road |
Antioch Church Road | Old Rock Road |
Syrup Mill Crossing | Cato Road |
Plantation Drive | Katherine Lane |
Cosby Circle | Parks Mill Trace |
Walker Church Road (from Connector to Armour Bridge Road) |
|
Roads to be Resurfaced
Tree-A-Coon | Forks Road |
Hounds Ear Road | Cannon Trail |
Hawks Bill Drive | Parks Mill Trace |
West Paces Road | Eley Road |
Fox Chase Run | Plantation Drive |
Cato Road | Cosby Circle |
Big Rock Road | Katherine Lane |
Roads to Receive Either Chip-seal or Deep-patching with Asphalt Overlay
Road Name | Type of Repair | Length of Repair |
---|
Carey Station Road | chip seal w/overlay | 3.85 miles (from I-20 Bridge to Hwy 278) |
Walker Church Road | chip seal w/overlay | 2.65 miles (from Connectors to end) |
Syrup Mill Crossing | patching w/overlay | 4.50 miles (from City Limits to Veazey Road) |
Veazey Connector | chip seal w/overlay | 2.54 miles |
Antioch Church Road | patching w/overlay | 2.05 miles |
Armour Bridge Road | overlay only | 2.84 miles |
Linger Longer Road | patching w/overlay | 1.95 miles |
Club Drive | overlay only | 0.63 miles |
Wright Lane | overlay only | 0.21 miles |