Requirements for Erosion Sedimentation & Pollution Control Plan, LDP and NOIs
If any of the following situations apply to your job, an ES&PC Plan by a design professional , an LDP with septic letter (if applicable ) and an *Notice of Intent (NOI) submitted to the state Environmental Protection Division (EPD) are required.
- Within a Common Development developed on or after August 2000.
- Disturbing More Than One Acre
- Within 200’ of State Waters this includes spring fed ponds, creeks, streams, etc.
*A Notice of Intent (NOI) submitted to the EPD via their online website, GEOS, has a state mandated 14-day waiting period from the date of submittal before any permits are issued.
Stand-Alone Requirements
Single Family Residential
(Construction Activities that are NOT within a Common Development)
Disturbing less than 1 acre and NOT within 200’ of state waters
- A Stand Alone ES&PC Plan is required
- A LDP will be issued at NO CHARGE
Disturbing less than 1 acre and WITHIN 200’ of state waters
- ES&PC Plan is required
- LDP is required
- NOI must be filed with the state
Stand Alone Requirements
Other Than Single Family Residential
(Construction Activities that are NOT within a Common Development)
Disturbing acreage within 200’ of any state waters.
- ES&PC Plan is required
- LDP is required
- NOI must be filed with the state
Definitions
ES&PC - Erosion Sediment & Pollution Control
LDP - Land Disturbance Permit
NOI - Notice of Intent
Stand Alone Construction - Construction activities NOT within a Common Development