Mobile Home Permit Procedures

Do not move the mobile/manufactured home into the county without first getting your permit to avoid any penalties.


How to Apply

Navigate to the Permit Portal, scroll to the bottom of the page, and complete the Manufactured Home Permit Application.  

Documents Required to be Uploaded

  • Site Plan
  • Bill Of Sale
  • Copy of Tax Commission Decal
  • Septic Permit - This can be obtained by contacting the Greene County Health Department.
  • Proof of Contractor Business License and State License Numbers

Procedures

The manufactured home must not be put on the lot until the manufactured home permit is approved. A double fee will be assessed if this occurs. Putting the home on the property does not assure you of a permit.

Pre-owned manufacture Home(s) must be inspected by the building inspector/code enforcement officer before entering the county. This service includes a fee for the inspection ($50) plus a fee for mileage to be paid in advance.

Square Footage Requirements

Minimum square footage of mobile manufactured homes must be 1,000 square feet unless placed in a mobile home park.

Zoning

Please check zoning for the property to make sure a mobile/manufactured home is allowed. Only one home is allowed on each parcel of property. 

  1. Building & Zoning

    Physical Address
    1034 Silver Drive
    Suite 103
    Greensboro, GA 30642

    Fax: 706-453-2579

  2. Permit Clerk


Electrical Permit

This must be permitted from the building department. Power will not be granted until all code requirements have been met and a notice of service sent to the power company by the building department.